T: 024-3601462

Voestalpine Kabeltunnel

HI-FOG® protects the nearly four kilometers long cable tunnel that delivers power to the steel plant of Voestalpine, maker of high quality steel products.
The HI-FOG® tubing network is divided into 116 separate sections throughout the tunnel and has over 1300 spray heads. Two high pressure pump units supply water to the system.