T: 024-3601462

ABN AMRO CCA noord en zuid Amstelveen

At two locations in Amstelveen new data center spaces were realized on behalf of Engie. It concerns two renovation projects where a part of the available spaces has been given a new use.

To protect the new data centers – and to ensure business continuity – an HI-FOG® water mist installation has been installed in the buildings.

The systems installed in the project are often of the pre-action type to minimize the chance of unwanted activation (with possible water damage). One of the characteristics of a pre-action system is that the pipes in the protected areas are only filled with water after the fire has been detected. The water mist installations are supplied in both buildings through an MSPU pump unit.